CABLE TO [DELETED] FROM [DELETED] RE GO NBR 36 ON 16 AUGUST, DURATION 2.00

Created: 8/17/1962

OCR scan of the original document, errors are possible

OXCART

FSV NBRISTRIBUTION THIS MESSAGE LIMITED TO THOSE WITH ABSOLUTE NEED TO KNOW.

GO MMNUGUST, TYPE MISSION! STABILITY. WATERAKE OFF TO BASE MAX. ALTITUDE OF BASEAX. KEAS OF BASEAX, MACH OF BASE PLUS POINT 1. URST'S DURING STABILITY CHECK FROM ALTITUDE OF BASE MINUSO NO ENGINE PROBLEMS. , ARTICLE.

3 RIGHT76L, 61

TAXI TEST SCHEDULED ON AFTERNOON OFUGUST, HIGH FASE GO SCHEDULEDUGUST.

FSW ENGINEAY VARY ONE OR TWO MINUTES AS COMPARED TO ACTUAL ACCOUNT END OF DAY. ALU ERRORS WILL BE CORRECTED ON NE.XT DAY FSV'S AND WRITTEN REPORTS. ECEIVE TFT'S END OF DEBRIEFING, AT TIMES THEY CHANGE UPON REACHING INSPECTION.

ESTN PROCESS OF INSTALLING OIL LOW jygJjFJ^ j

7

rt

FROM AUTOMATIC DOWNGRADING ANO DECLASSIFICATION...

(INTWO

INDICATING SYSTEM. COMPLETED ALL STEEL AND IRON WORK. SEVERAL MINOR MODIFICATIONS REMAINING.

END OF MESSAGE

Original document.

Comment about this article, ask questions, or add new information about this topic: